News and Press Releases

Drilling update

November 29, 2008

Sefton Resources Inc. ("Sefton" or the "Company") announces that its wholly owned subsidiary, TEG Oil & Gas USA, has successfully completed its drilling programme at the Hartje #16 & #17 wells. Both wells were drilled in the east-central portion of TEG's Tapia Oil field. They were completed in the Yule oil sand, encountered at vertical depths of approximately 1,100 feet below surface. The wells were directionally drilled from existing surface well pads. This minimizes surface impact and consolidates surface facilities for efficient oil production operations into the future.

The drill rig is currently demobilizing from the Hartje #17 well location. The installation of a surface pumping unit and final electrical and flowline hookup will commence as soon as the drill rig equipment is cleared from the pad. TEG plans to complete this work and commence production from Hartje #17 by the middle of next week.

The Hartje #16 well has been producing for four days. Over that time, the well has averaged approximately 70 BOPD from the 120 feet of Yule oil sand completion interval. This rate is expected to settle out to a standard 30-day Initial Production (IP) rate of greater than 40 BOPD. TEG is very pleased and encouraged by the results thus far and a further announcement on Hartje#17 will be made when it has production figures available.

The Company's Steam Testing Programme continues. TEG has scheduled a singles workover rig to service the Yule #8 gas supply well for the first week in December. The well tested at 1,150 Mcf of gas per day during an 8-hour flow test in January of 2004. Since that time, the well has set idle. Over this four-year period, fluid had collected in the Yule #8 well, sourced from a lower interval that was opened prior to testing the gas zone. TEG has successfully isolated the non-gas-productive perforations that were open in the well and interfering with consistent gas flow. The additional work planned will complete this repair and the gas will then be routed to the steam generator. Further news will be made available when the current testing has been completed.

For further information, contact:

John James (Jim) Ellerton, CEO Tel: 00 1 303 759 2700
Jeremy Delmar-Morgan, Chairman Tel: 077 8900 4874
David Millham, Investor Relations Tel: 020 7796 9999
Nicola Marrin, Seymour Pierce Limited Tel: 020 7107 8000

Note: The information in this release has been compiled and reviewed by Harry Barnum, a director of Sefton, who is a qualified person for the purposes of the AIM Guidance Note for Mining, Oil and Gas Companies issued on March 16, 2006. Mr Barnum has Bachelors and Masters Degrees in Geology and over 20 years of experience in the oil and gas industry. He is a registered professional geologist in the State of California.